Review Process of Fabrication Drawings and Erection Drawings

Fabricator should review the shop drawings and other submittals in conformation with the Contract Documents. When required, the shop drawings should bear the signature and seal of the responsible Structural Engineer.

Author: James Lee
Article Tools:           

In the construction process, basic function of a fabricator is to provide all necessary shop drawings and construction documents to the contractor. These drawings are prepared after thorough review of the design drawings, specifications and bidding documents provided by the structural engineer.

Fabrication drawings commonly include the following:
# Structural Element Drawings
The drawings for basic structural members, such as web steel joists, must be sealed, signed and dated by the Structural Engineer.

# Erection Drawings
These drawings primarily show the placement of structural members, connections and components to be supplied by the fabricator. When these drawings include design by the Structural Engineer, the drawings shall be sealed, signed and dated by the Structural Engineer.

# Connection Design or Shop Fabrication Drawings
These drawings provided by the fabricator shall give all information necessary for shop personnel to assemble and fabricate the components. These drawings shall be sealed, signed and dated when incorporating design by the Structural Engineer.

# Construction Engineering Drawings
These drawings provided by the contractor shall cover load analyses, temporary bracing and erection sequence. The drawings shall be sealed, signed and dated by a qualified member.

Drawing submittals should be reviewed for common compliance with the structural Contract Documents but generally the review does not include issues such as checking dimensions and review of the safety measures. The General Contractor is required to review the submittals before it gets reviewed by the SER.

Fabricator should review the shop drawings and other submittals in conformation with the Contract Documents. When required, the shop drawings should bear the signature and seal of the responsible Structural Engineer. The Structural Engineer whose seal and signature appear on the drawings is responsible for the design of the Structural Members and connections indicated.

For any queries related to structural drawing related services email us at info@outsourcingsteeldetailing.com

About Author

James Lee is a Structural Engineer at OSTD – a leading Engineering consultant providing quality steel detailing, steel design and structural drawing services to its offshore clients based in US, UK, Canada and Australia. For further details email us at info@outsourcingsteeldetailing.com Visit us at http://www.outsourcingsteeldetailing.com/ for more information.

Article Source: http://www.1888articles.com/author-james-lee-14840.html

Other Related Articles

Windows Registry corrupt post fatal Virus Attack by Jacob Luis

Information about Boundary Surveying by Johnseo

Payday Loans No Faxing: Monetary solution at your doorstep by Ravi Mishra

Review Process of Fabrication Drawings and Erection Drawings by James Lee

6 Tests to Choose Data Conversion Company by Bea Arthur

Windows Vista SP2 Installation Fails with 0x80004005 Error by Jacob Luis



Business
All Category